Sep 05, 2022
Wiring
- (4.5 hours)
Category: Avionics
Installed CAN Bus terminator in GMU 11 connector. Connected iPad power plugs. Power plug and cooling fan check ok. Started wiring Artex ELT dSub connector. Need solder sleeve. Installed firewall fixtures: Starter and Master solenoids, Engine pressure transducer manifold, Red Cube fuel flow, and Master Grounding terminal block.